Arrangement of infrastructure and the purchase of land in the settlement Hudeje

PROJECT DESCRIPTION

The project included the implementation of a Municipal wastewater treatment plant Blato with the sewage pipeline connection to the sewage network of the Roma settlement Hudeje, including the holding of the electrical, water supply and road connection and the implementation of the second phase of the infrastructure, comprising the execution of two unclassified roads, sidewalks for pedestrians with street lighting on the LC 425202 in the area of Roma settlements Hudeje.

OBJECTIVES AND PURPOSE OF THE PROJECT

  • construction of a wastewater treatment plant with the capacity of 600 PE,
  • construction of a 300 m long connecting sewer,
  • reconstruction of local roads and pavements for pedestrians arrangements in the length of 120 m,
  • construction of two road sections with a total length of 260 m

COSTS
FINANCING

  • Ministry of Economy and Technology 413.426,11 €
  • Municipality of Trebnje: 18.634,32 €
  • Total value of the project = 432.060,43 €

IMPLEMENTATION

August 2013 – October 2013
 