Building water reservoirs Medvedjek and replacing pipeline Medvedjek - Temenica

PROJECT DESCRIPTION

Trebnje reconstructed the western part of the county a total of approximately 3 km of water supply pipelines, build a water storage capacity of 500 m³ and removed the existing pool of wash water treatment plants for drinking water.

OBJECTIVES AND PURPOSE OF THE PROJECT

The purpose of the capital investment is to reduce water loss and regulation of water supply in the area of influence of the present water supply lines.
The aim of the investment is to ensure an uninterrupted supply of water, namely:

  • construction of the reservoir Medvedjek 500 m³,
  • installation of new ductile iron pipes DN300 in the length of 967 m on the pipeline Medvedjek - Temenica (to the railway)
  • installation of new ductile iron pipes DN200in the length of 538 m on the pipeline Medvedjek - Pekel
  • installation of new ductile iron pipes DN300 in the length of 1,485 m and DN 150 Main in the lenght of 25 m on the pipeline Medvedjek - Velika Loka,
  • demolition and removal of existing basin for washing water and replacement with the treatment plant for drinking water.

FINANCING

  • European Fund for Regional Development 664.919,08 €
  • Municipality of Trebnje 325.998,32 €
  • Total value of the project 990.917,40 €

IMPLEMENTATION

The years 2009 and 2011
 