Energy reconstruction of the primary school Trebnje

PROJECT DESCRIPTION

Through the project an energy rehabilitation of the sports hall was conducted, which included the replacement of roofing, insulation of facades, replacement of the furniture, reconstruction and refurbishment of changing rooms.

OBJECTIVES AND PURPOSE OF THE PROJECT

The aim of the operation is to improve the energy efficiency of gyms in Trebnje Primary School, environmental protection and the realization of potential savings in energy use.
The aim of the operation is energy rehabilitation gyms in Trebnje Primary School, which comprises:

  • the facade of modular facade panels thickness of 15 cm,
  • the replacement of windows in the shell of the building (triple glazing insulating glass)
  • replace the door on the shell of the building,
  • implementation of loft insulation (roof sandwich panels filled with mineral wool)
  • optimizing heating systems (installation of thermostatic valves)
  • installation of a system for automatically collecting energy consumption (energy monitoring) and
  • implementation of the remaining part of the CCI (Installations, preparatory work and the finalization of the object).

COSTS
FINANCING

  • Cohesion fund: 172.837,97 €
  • Republic of Slovenia 12.209,31 €
  • Municipality of Trebnje 131.576,29 €
  • Total value of the project = 316.623,57 € 

IMPLEMENTATION

May 2014 – November 2014
 