Reconstruction of the road to the Roma settlement Smrekec 1 and 2

PROJECT DESCRIPTION

In the context of the operation the reconstruction of the road from the section at industrial road by Motvoz factory to the reconstructed road in the Roma settlement Smrekec was planned.

OBJECTIVES AND PURPOSE OF THE PROJECT

The basic objective of the operation was the reconstruction of the 329 m long road section: the substructure and asphalt, pavement unilateral arrangements, arrangements storm and connecting sewer and public lighting were reconstructed. The works were carried out with the goal of improving road safety and living conditions of the Roma.

FINANCING

  • Republic of Slovenia € 218,625.65
  • Municipality of Grosuplje € 48,097.64
  • Total project value= € 266,723.29

IMPLEMENTATION

April 2013 - December 2013
 